No Services Descrption Client Location Amount [In Lac] Year
1 ROAD WORKS Construction of Cement Concrete Pavement and Allied works on internal roads of Haridwar Society in T.P.S.NO. 23 (Kosad) F.P.NO. 59,60, Block No. 112 in North Zone(Katargam), Surat. Surat Municipal Corporation North Zone, Surat 46.10 2020-21
2 Providing and laying 250MM RCC pipes drainage line in internal road of Shivdarshan Row House T.P.69 (Godadara - Dindoli) in South East Zone Limbayat Surat Municipal Corporation South East Zone, Surat 11.86 2020-21
3 UNDERGROUND DRAINAGE PIPELINE Providing & Laying NP3/NP4 class R.C.C. drainage pipe line in T.P.S. no. 8, 9 and palanpor gam including replacing to the existing drainage line (Pocket -A) in west zone area of drainage department. Surat Municipal Corporation West Zone, Pal-Palanpor, Surat 469.54 2017-18
4 BRIDGE WORKS construction of bodhwada-semliyapura-gangli (narmada parikrama path)appraoch road with level bridge. P.W.D. N.V.D.A. MP bodhwada-semliyapura-gangli 724.24 2018-19
5 BRIDGE WORKS Construction of High Level Bridge with apporach at Teladi Nallah ,near Kundiy Village Tehsil & Distt. Barwani. P.W.D. N.V.D.A. MP kundiy village tehsil & Distt.Barwani 779.13 2018-19
6 BRIDGE WORKS Construction of bridge under Pradhan Mantri Gram sadak Yojana Including Maintanance for five year after construction PIU Barwani, MP P.M.G.S.Y. (PIU) MP PIU Barwani, MP 377.74 2018-19
7 UNDERGROUND DRAINAGE PIPELINE Providing and laying RCC NP3/NP4 class pipes of different dia from Shivdhara Campus to Mota Varachha GEB sewage pumping station for augmentation of drainage system of New North Drainage Zone Surat Municipal Corporation North Zone, Surat 129.52 2018-19
8 UNDERGROUND DRAINAGE PIPELINE Providing and laying RCC NP3/NP4 class pipes with spigot socket/flush type rubber ring joint drainage pipe line from Subras Railway under pass to Navagam SPS under East Drainage Department Surat Municipal Corporation East Zone,Surat 113.69 2019-20
9 UNDERGROUND DRAINAGE PIPELINE Providing and laying RCC NP3/NP4 class pipes with spigot socket/flush type rubber ring joint for sewerage network for ramaining area of GODADARA-PARVAT Sewage pumping Station area in South East Drainage Zone area of SMC Surat Municipal Corporation South East Zone, Surat 85.87 2019-20
10 BRIDGE WORKS Construction of Bridges Under Pradhan Mantri Gram Sadak Including Maintanance For Five Year After Construction PIU Burhanpur -MP48B15 P.M.G.S.Y. (PIU) MP Burhanpur, MP 194.59 2019-20
11 BRIDGE WORKS Construction of Bridges Under Pradhan Mantri Gram Sadak Including Maintanance For Five Year After Construction PIU Burhanpur -MP48B14 P.M.G.S.Y. (PIU) MP Burhanpur, MP 248.09 2019-20
12 BRIDGE WORKS Construction of Bridges Under Pradhan Mantri Gram Sadak Including Maintanance For Five Year After Construction PIU Burhanpur -MP48B16 P.M.G.S.Y. (PIU) MP Burhanpur, MP 230.64 2019-20
13 Construction of flood gate structure at inlet of Varachha creek under Tapi shuddhikaran project in SUDA area in Drainage Department Surat Municipal Corporation East Zone,Surat 75.46 2019-20
14 Construction of Diversion wall with sluice gate at Gadhpur, Valak and Varachha Creek for Tapi Suddhikaran Project in Drainage Departmnet Surat Municipal Corporation East Zone,Surat 253.07 2019-20
15 UNDERGROUND DRAINAGE PIPELINE Under Amrut Mission Scheme Construction, Testing & Commissioning of Strom Water Drains at Chaklashibhagol to ring road and Marida road to existing open kans Nr. paper mill, Ring Road Nadiad.(with 5 years O & M) Shree Hindustan Fabricators Nadiad Nagarpalika 1560.93 2018-19
16 Construction of road works (Main carriage way of rigid payement, service road and cycle track of flexible payement and foothpath pf paver blocks) including fiving electrical pole and all relevant road furniture,Providing and supplying potable water supply network, tranmission main, electrical cable trench and strom drainage network for phrase-1 of dream City Limited Surat with operation and maintenance For 5 Years. UNIQUE/DREAM CITY Dream City 1411.93 2019-20
17 ROAD WORKS Construction of civil works under the bridge from Chinchwad link road in front of Yashopuram Society Sant Garden sai grace society (PCMC). Pimpri-Chinchwad Municipal Corporation PCMC 916.59 2019-20
18 UNDERGROUND DRAINAGE PIPELINE strome water dmin at various places under 14th nanapanch yojana ( 2018 - 2019 ) within municipal area of gandevi nagar palika, gandevi, dist. navsari, Gandevi Nagarpalika Gandevi Nagarpalika 117.58 2019-20
19 Construction of road works (Main carriage way of rigid pavement, service road and cycle track of flexible pavement and footpath of paver block) including fixing electrical pole and all relevant road furniture, providing and supplying potable water supply network, transmission main, electric cable trench and strom darainage network of Phase 1 of Dream city Limited Surat with opration and maintenance for 5 year. UNIQUE/DREAM CITY Dream City 1700.00 2019-20
20 UNDERGROUND DRAINAGE PIPELINE Maintainance and Repairing work of existing sewer Drainage line and Storm line, Manhole, Inlet chambers and Providine & Laying sewer Drainage & Storm line pipes, Manhole, Inlet chambers as per requirment on different places in Sub Zone-1 & 2 of South West (Athwa) Zone, Surat. Surat Municipal Corporation South West Zone, Surat 64.65 2019-20
21 Construction of R.C.C. Box Culvert from Gosai Circle (Bombay Market to Archana Bridge) to Existing Khadi F.T.P. No. 03 ((Karanj) in Old East Zone - A (Varachha). Surat Municipal Corporation East Zone,Surat 174.27 2019-20
22 Construction of Cement Concrate Pavment & Allied works on Internal Roads of Poojan Row House V-1 in F.P.No. 254 in D.T.P.S.No. 13 (Adajan) in West Zone (Rander) Surat Municipal Corporation West Zone, Surat 13.45 2020-21
23 Construction of Cement Concrate pavment and allied work on internal road of Shree Rang Krupa Society at F.P.No. 74/B , of D.T.P. 9 (Majura) in South West Zone Athwa Surat Municipal Corporation West Zone, Surat 8.93 2020-21
24 Construction of Cement Concrate pavment and allied work on internal road of Girdhardware Society v-3 at F.P.No. 31,32,35, of D.T.P. 36 (Althan) in South West Zone Athwa Surat Municipal Corporation South West Zone, Surat 22.76 2020-21
25 Construction of Cement Concrate pavment and allied work on internal road of Kabir Nikunj Society at F.P.No. 44/A/1, of D.T.P. 27 (Majura Bhatar) in South West Zone Athwa Surat Municipal Corporation South West Zone, Surat 8.58 2020-21
26 Construction of Cement Concrate pavment and allied work on internal road of Rang Krupa Society at F.P.No. 74/B, of D.T.P. 9 (Majura) in South West Zone Athwa Surat Municipal Corporation South West Zone, Surat 8.93 2020-21
27 Construction of Cement Concrate pavment and allied work on internal road of Kalptaru Society at F.P.No. 460, of D.T.P. 03 (Katargam) in North Zone Katargam Surat Municipal Corporation North Zone, Surat 14.96 2020-21
28 Construction of Cement Concrate pavment and allied work on internal road of Sangna Society at F.P.No. 125/A, D.T.P. 68 (Puna-Simada), Block No. 324 in New East (Varachha) Zone Surat Municipal Corporation 21.69 2020-21
29 Construction of Cement Concrate pavment and allied work on internal road of Gopaleshwer Row House at F.P.No. 43 , D.T.P. 23 (Rander) in West Zone Rander Surat Municipal Corporation West Zone, Surat 29.64 2020-21
30 UNDERGROUND DRAINAGE PIPELINE Providing & Laying drainage line for rehabilation of Sewerage system in Central Zone (Nanpura sewerage line Area) under 2nd phase of Drainage master plan, (Package -12 ) Surat Municipal Corporation Central Zone,Surat 585.34 2020-21
31 Construction of Cement Concrate pavment and allied work on internal road of Vishal Nagar Society - 2 at F.P.No. 45 , D.T.P. 18 (Katargam) in North Zone Katargam Surat Municipal Corporation North Zone, Surat 26.19 2020-21
32 Construction of Cement Concrate pavment and allied work on internal road of Dattkrupa Society at F.P.No. 142 , D.T.P. 19 (Katargam) in North Zone Katargam Surat Municipal Corporation North Zone, Surat 13.94 2020-21
33 Construction of Cement Concrate pavment and allied work on internal road of Shree Satya Sai Nagar Society at F.P.No. 25 , D.T.P. 19 (Katargam) in North Zone Katargam Surat Municipal Corporation North Zone, Surat 28.75 2020-21
34 Construction of Cement Concrate pavment and allied work on internal road of Deep Jyot Society at F.P.No. 44 , Block no. 84/2 of D.T.P. 49 (Katargam) in North Zone Katargam Surat Municipal Corporation North Zone, Surat 6.39 2020-21
35 Construction of Cement Concrate pavment and allied work on internal road of Sai Ashishnagar Vibhag -2 at F.P.No. 11 , of D.T.P. 14 (Adajan) in West Zone Rander Surat Municipal Corporation West Zone, Surat 80.76 2020-21
36 BRIDGE WORKS Construction Of Bridge Joining T.P. No. 64 (Magob-Dumbhal) And T.P. No. 19 (Parvat-Magob) Khadi Near Madhavbaug Society At Surat on E.P.C. Basis. (Design, Engineering, Procurement and Construction). Surat Municipal Corporation Magob-Dumbhal 324.80 21-22
Total 10880.6